The General: Getting Other Trades Involved and How To Be A General Contractor Part One: Stucco.

With the project sufficiently mature, the time has come to involve other trades for work that I was not going to do by myself. I had to get a new roof put on, get the stucco put up, paint the exterior trim, and get a new HVAC system installed. I had planned all along to contract these jobs out because there really are limits to what even a pro can do by themselves (and I’m just a lowly, but enthusiastic, DIY’er). Finally, I could relax a bit and have someone else do the hard work, right? Well, not so fast….

It turns out that when you start to bring other trades in, you have to work as your own general contractor. That means coordinating schedules, materials, inspections and the like. Fortunately for me, I have a lot of experience in coordinating projects, so this one was really not so tough from a management perspective. However, I had to hustle to make sure that I did my part of the job and get truly ready for the next steps. The one thing that you have to understand are the dependencies that the jobs have on one another.

We start with the stucco. I had to coordinate the stucco and the roofing because, on my home, there was some interrelated work. I had to contract with a roofing company and get on their schedule, and they had to come out and do some preliminary roofing work before the stucco contractor could start. The stucco contractor then had to agree that he could finish the work before the roofing folks came in. But it turns out that some other trades were involved, and because I was covering those, I had to get back to work! For example, I had to finish rough electrical work around the living room and porch because they would be inaccessible after the stucco was up. So I had to DO the work, then schedule an inspection to get it signed off, then finish installing the plywood substrate and all of the other electrical penetrations. I also had to install bases for the new exhaust vents (dryer and ventilation fans) before the lath was put on. Even so, I forgot the doorbell and the intercom penetrations. I’ll just have to compensate later.

Getting ready to cover this area with plywood. I had to tear it all apart to get the porch roof beam installed, and as long as it was uncovered, I took the opportunity to fix up the wiring and add new coaxial and ethernet cabling.

Getting ready to cover this area with plywood. I had to tear it all apart to get the porch roof beam installed, and as long as it was uncovered, I took the opportunity to fix up the wiring and add new coaxial and ethernet cabling. I also had to get this inspected and all buttoned up before the stucco lath folks showed up. I had to hustle!

Insulation installed prior to lathing. This is R-19 underneath where the master bedroom floor cantilevers out by about 12 inches.

Insulation installed prior to lathing. This is R-19 underneath where the master bedroom floor cantilevers out by about 12 inches.

Nice lath job around the front door.

I also had to install all of the electrical fixtures (see the little yellow wire) and get a new front security door before the lath started. That’s because there was not enough clearance to remove and replace the old door without damaging the stucco. More unexpected work!

So, I finally got to the point where the lathing could take place, but I had one problem: I needed to remove the old electrical panel, and in order to do that I had to get the electrical service transferred. I worked with my stucco guy and we worked out a plan where I would get the electrical service transferred first thing on a Friday, then rip out the old box and have the lather come in and finish the area around the old electric box. Then the inspector would come later in the day. Unfortunately, the guy who was supposed to come to finish the job didn’t show, and the stucco contractor had to get a substitute who (a) came too late, so the inspection was called off and (b) was not a lath specialist, so he missed a few things. Fortunately, my stucco contractor and I came up with a plan “B” and he had somebody come out the following Monday to make sure everything was right, and then we got the lath inspection completed on Tuesday.

Utility workers pulling new electrical cables through the conduit that I installed almost 2 years ago. These guys are working on live lines, but are extremely careful to only work with one at a time. and they know how to do it safely. I'm way to chicken to ever do this.

Utility workers pulling new electrical cables through the conduit that I installed almost 2 years ago. These guys are working on live lines, but are extremely careful to only work with one at a time. and they know how to do it safely. I’m way to chicken to ever do this.

New meter installed. Actually, it's really just the existing meter taken out of the old panel and installed in the new main panel. Still, it's my nwe electrical work which has been given life!

New meter installed. Actually, it’s really just the existing meter taken out of the old panel and installed in the new main panel. Still, it’s my new electrical work which has been given life!

My old electric meter is now out, but we only have a few hours before the inspector comes to inspect the lath. I'm not feeling good about this...

My old electric meter is now out, but we only have a few hours before the inspector comes to inspect the lath. I’m not feeling good about this…

Temporary electrical hookup. I needed to install a working electrical system so I just ran new wires to the existing wiring and secured it. with tie wraps. It's neat, and it's exposed so I can monitor it, But definitely will need a total replacement. The good news was that everything worked when I turned it on the first time!

Temporary electrical hookup. I needed to install a working electrical system so I just ran new wires to the existing wiring and secured it. with tie wraps. It’s neat, and it’s exposed so I can monitor it, But definitely will need a total replacement. The good news was that everything worked when I turned it on the first time!

This little experience highlights something that I have found important as a project manager: A good project manager knows how to anticipate problems and avoid them, but also knows how to accommodate when unforeseen problems occur. I knew that scheduling a bunch of things to happen in a certain sequence that Friday had inherent risk. The electrical switchover had to go just right and be timely, the stucco guy had to come early enough and finish, and the inspector had to come late enough to give the lather enough time. So, things didn’t work out, but it was worth the try to maintain schedule. The good news was that I was done with all of the work that I was personally responsible for, so now, I’m not in the way. Nothing makes me more productive than the last minute!

The stucco work commences first with the scaffolding. This Sam the scaffold man. His work is solid and so much better than the tower scaffold that I had to endure working on during the construction of the addition.

The stucco work commences first with the scaffolding. This Sam the scaffold man. His work is solid and so much better than the tower scaffold that I had to endure working on during the construction of the addition.

Scaffolding all ready to go to start work!

Scaffolding all ready to go to start work!

Removing some of the old stucco in front. We just had to get rid of all of that

Removing some of the old stucco in front. We just had to get rid of all of that “chunky monkey” look that was popular when these houses were built. It’s not popular anymore.

Lath installed where I will get the new stucco. The rest of the house will be color coated only, but the combined effect will be like getting a brand new stucco finish.

Lath installed where I will get the new stucco. The rest of the house will be color coated only, but the combined effect will be like getting a brand new stucco finish.

The next day, the stucco guys came in and started the “scratch” coat, which is the first part of a 3 part stucco siding. It is designed to cling to the lath and help tie in the rest of the stucco. It is called the “scratch” coat because the finish is “scratched” to provide a good bond for the rest of the stucco. The following day, they came in and did the “brown” coat. This is the coat that gets close to the final depth of the siding, and is finished fairly smooth. Not sure why it’s called a brown coat, but that’s the lingo. Now it was time to wait a few days before the color coat. I had a hard deadline coming up because I needed the stucco guys out so the roofing guys could come in.

Let the stucco begin! First application of the scratch coat has started.

Let the stucco begin! First application of the scratch coat has started.

The mixer man dumping a load to hod around. This stuff is really heavy!

The mixer man dumping a load to hod around. This stuff is really heavy!

 

Brown coat complete. It really looks good, and will even look better once the finish coat is applied over the whole house.

Brown coat complete. It really looks good, and will even look better once the finish coat is applied over the whole house.

The next week, a couple of guys came out to do the scaffolding on the entire house. That was an all day job and it really had to be all over. This is one of the many reasons that stuccoing an entire house is NOT a DIY project! Then, the stucco finishers came out and started putting the color coat on. When they put it on the back, they smoothed out the existing texture and then put an awesome lace texture on. These guys are really artists — well maybe not Michaelangelo, but same idea (and same medium).

Scaffolding on the West side of the house. Scaffold set-up and take-down is a significant part of the cost of the work.

Scaffolding on the West side of the house. Scaffold set-up and take-down is a significant part of the cost of the work.

Scaffolding outside my loft window. I'm glad somebody else is doing this work while dancing on scaffolding!

Scaffolding outside my loft window. I’m glad somebody else is doing this work while dancing on scaffolding!

The man at the mixer mixing the color coat. Apprentices get to do the heavy work of mixing the stuff up and hodding it around to keep the plasterers busy so that they have time to work with the material. This is why I subcontracted this work out. Definitely NOT DIY!

The man at the mixer mixing the color coat. Apprentices get to do the heavy work of mixing the stuff up and hodding it around to keep the plasterers busy so that they have time to work with the material. This is why I subcontracted this work out. Definitely NOT DIY!

Color coat being applied over existing stucco (right under the eaves).

Color coat being applied over existing stucco (right under the eaves).

The master plasterer at work. Michelangelo had nothing on this guy!

The master plasterer at work. Michelangelo had nothing on this guy!

Stucco is a very messy trade. Sort of like sausage making -- you don't want to see the process, but you like the result.

Stucco is a very messy trade. Sort of like sausage making — you don’t want to see the process, but you like the result.

In the end it all worked out. I was very pleased with the result, and my home is becoming the envy of the neighborhood. Next, onto the roof!

beautiful-texture

Close-up of the texture. This is real artisan stuff here. I have a very unique product that looks great!

color-coat-complete

Color coat complete. Looks fabulous! The roofers are coming next week, so the scaffolding still has to be removed. It’s going to be tight with the schedule!

The House That Frank Built

OK sports fans! This moment has been many years in the making. The moment when I, and only I, will bust out the structure of our house with the intention of EXPANDING our living space and making a fantastic en-suite (master bedroom-master bathroom) in a manner that puts HGTV to shame! Because this is a big task, and I needed to focus all of my spare time on it, I haven’t made a blog entry for a while. It’s either work on the house and generate material for the blog, or write the blog and make stuff up. I prefer the former. I took 2 weeks of vacation to accomplish this bodacious task, and I got most of the way through. At least I put up the walls and the roof trusses. But it took another 4 weeks of my spare time to finish the roof structure, put the trim on, and finally cover the roof.

Phase 1: Demolition.

As with most building projects, the first part is the demolition. I know I’ve been talking about demolition a lot, so I won’t bore you with too much more of it. As with most demolition projects, the best course of action is to work from the top down, and to disassemble whatever you’re demolishing in the opposite order that it was built. Because the bedroom extension will also result in extending the roof (sleeping under the stars is OK if you’re camping), I began by stripping the shingles from a portion of the roof. My biggest concern was roof safety. If there is anything dangerous in this endeavour, this is it. So I took some time to get the proper equipment: roof jacks, scaffolding, and a safety line with a harness. Yes, it cost a few bucks, but it’s cheap insurance. As I have mentioned in previous posts, I’m a bit obsessed with safety. The other nifty tool that I got was a roofing shovel. This tool has a notched spade that you ram underneath the shingles to get under the roofing nails, and a fulcrum that allows you to pop the nails right out. The technique is to start at the top of the roof, and after you pry off the ridge shingles, you get a start on the shingles at the top and then just go to town. That being said, even with the right tools and safety equipment, it’s hard, tedious, and somewhat messy work.

Safety harness and safety line. It's kind of a PITA to work with, but it sure provided me peace of mind. This is what all the pros use now.

Safety harness and safety line. It’s kind of a PITA to work with, but it sure provided me peace of mind. This is what all the pros use now.

Roof safety: Roof jacks to provide a solid base for working.

Roof safety: Roof jacks to provide a solid base for working.

Roof stripping complete. Took me all day.

Roof stripping complete. Took me all day.

 

Next was the trim. One might think that removing trim is no big deal. But it was to me because I had to get way up high and had to bang and lever stuff around, keep my balance while precariously perched on the scaffolding and ladder, all the while making sure that whatever fell down didn’t fall on me. The other bad news was that we were experiencing a record heat wave, so that meant that every push and pull was accompanied by beads of sweat in my eyes, lack of energy, and dehydration. I kept trying to drink as much water as I could, but there’s really no way to keep adequately hydrated while doing heavy physical labor in 96 degree heat.

Roof overhang and trim removed.

Roof overhang and trim removed.

Now, on to the messy part: Knocking down the walls. This part of the demolition worried me a bit. I didn’t want to spend a lot of time cutting stucco vertically on the wall, but I needed to get the wall down in pieces that were not so big they would damage the subfloor when they would inevitably come crashing down. I first had to knock down the gable wall, first by taking down the triangular portion of the gable by splitting it at the top plate, and then taking down the vertical walls. Since the side walls are load bearing, I had to build a temporary structure to accept the load. Also, I only took down one of the side walls at a time so only one side of the roof was unsupported. Because I didn’t want to have to cut stucco while precariously balanced on a ladder from the outside, I decided to pull the wall down from the inside. Since I know that the easiest way to cut the stucco is when the stucco is lying flat, I decided to yank the whole wall down and then disassemble it. Sure enough, with all of that weight of the stucco, it came down with a big crash! This turned out to be a very bad thing because I, like a dummy, did not think to put temporary bracing under the joists of the bedroom floor. Here is the result:

Gable wall demo complete. What have I gotten myself into?

Gable wall demo complete. What have I gotten myself into?

Temporary bracing to transfer the roof load to the floor. Too bad I didn't complete the job by constructing concurrent bracing to properly transfer the load from the underlying joists to the slab foundation below.

Temporary bracing to transfer the roof load to the floor. Too bad I didn’t complete the job by constructing concurrent bracing to properly transfer the load from the underlying joists to the slab foundation below.

Wall before demo.

Wall before demo.

Wall after demo.

Wall after demo.

Minor damage from the downfall of stucco. I had a surprise coming.

Minor damage from the downfall of stucco. I had a surprise coming.

Joist failure as a result of not properly transferring the load to the foundation. I'm going to put a bag over my head when I call my engineer for recommendations.

Joist failure as a result of not properly transferring the load to the foundation. I’m going to put a bag over my head when I call my engineer for recommendations.

Cracked joists. I needed to deal with termite damage anyway, so really no extra work. But I sure feel dumb!

Cracked joists. I needed to deal with termite damage anyway, so really no extra work. But I sure feel dumb!

Phase 2: Build the walls.

One of the tricky things about building on a second floor is that you actually have to get the building materials UP to the second floor. This meant spending the better part of a day tediously pushing lumber, mostly one piece at a time, up a ladder and onto the second floor. I had to plan ahead to make sure that I had all of the lumber for the entire build, including the interior framing and plywood, because I did NOT want to struggle hauling this stuff up the indoor stairs after I closed in.

Lumber delivered. Now, to get it up to the 2nd floor!

Lumber delivered. Now, to get it up to the 2nd floor!

Building a standard wall for a house is pretty straightforward. You layout and cut the lumber, build and sheath the wall while flat on the floor, and then raise it up. The easiest way is to start by carefully aligning your sole and top plates, and then doing the layout of the studs all at once. This not only saves time, but more importantly, helps to make the wall square because all of the top and bottom measurements are the same. The next thing to do is to make a “kit” for all of the framing lumber. This not only includes all of the studs, but also the headers, sills, cripple, and jack studs for the window and door openings, as well as the framing for each corner. From there, it’s a simple matter of separating the sole and top plates, scattering in the pre-cut parts, and then methodically nailing them together. It’s important to follow a nailing schedule, meaning that the prescriptive codes require specific sizes and spacing of nails for a given assembly. For example, a stud to sole plate or top plate can be two 16d nails driven longitudinally into the stud (“face nail”) or three 10d nails driven in from an angle (“toe nail”). Fortunately, the County of San Diego has a convenient summary sheet of all of these requirements, which the plans inspector “suggested” that I include as part of my building plans. I took the hint.

Wall lumber cut to length and organized to form a "kit". I did this for the lumber for all three walls.

Wall lumber cut to length and organized to form a “kit”. I did this for the lumber for all three walls.

All kit parts need to be labeled so you don't get confused. These are labeled "C/O" for "cripple" stud (window), and "outside" because the top is cut at a 5º angle to allow for water drainage from the sill.

All kit parts need to be labeled so you don’t get confused. These are labeled “C/O” for “cripple” stud (window), and “outside” because the top is cut at a 5º angle to allow for water drainage from the sill.

The next thing to do is to sheath the wall. In many building situations, it’s better to put the wall sheathing on after the walls are raised because you can do some adjustments for dialing in plumb and square, and you can apply the sheathing in a fashion that overlaps the structural assemblies to add some strength. However, it’s more difficult to fool around with large pieces of sheathing, particularly plywood, when you’re trying to hang it vertically. Putting the plywood on the walls while they were still on the floor was a no-brainer for me as a one-man-show. One thing I learned about walls is that 2×4 lumber can be pretty flexible on this scale. You have to use a big sledge hammer to bang stuff around, but it’s important to square things up before you put the plywood on, because once the plywood is attached, it ain’t movin’!

Lastly the wall needs to be raised. There are lots of pictures of construction crews all gathering around a wall, and with a mighty “heave ho”, the wall comes up. Not possible with just me doing the heaving. Fortunately, there is an outfit (Qualcraft) that makes something called a wall jack. This operates much like the old-fashioned car jack that you used to hook under your bumper to change a tire. But instead of a metal jack shaft with teeth, it uses a long 2×4 piece of lumber. It’s pretty ingenious, and here is a short video and some pictures:

Wall jacks in position, ready for action!

Wall jacks in position, ready for action!

Close-up of wall jack. 2x4 screwed into the floor prevents kick-out.

Close-up of wall jack. 2×4 screwed into the floor prevents kick-out.

 

Last wall up, ready for trusses.

Last wall up, ready for trusses.

Phase 3: Place the trusses.

Now that the walls were up, it was time to get some help. The trusses, by themselves, are not particularly heavy, but they are difficult to handle and are fragile if they are handled while they are flat. Fortunately, the same co-workers that helped me place the big beam I needed for my garage portal were willing to spend a morning yanking these bad boys up and securing them into position. I only had 4 of these, but we had a little trial and error at first, so it took a little longer. I also had them come back to help me with the gable wall. Now, it was up to me to finish detailing the front of the roof line with outlookers and blocking.

Last wall up. Things are beginning to take shape.

Last wall up. Things are beginning to take shape.

Trusses delivered.

Trusses delivered, ready for installation.

My "crew". Their help was indispensable in completing this phase of the project.

My “crew”. Their help was indispensable in completing this phase of the project.

Trusses are up!

Trusses are up!

Gable wall and outlookers in place.

Gable wall and outlookers in place.

Phase 4: Finish the roof.

Finishing the roof was actually a two step process. I first needed to get the trim boards placed on the ends of the truss overhangs and outlookers. These are called “barge” rafters, and these were particularly long and heavy. I spent an entire day messing around with scaffolding and engineering a “third hand” to hold the rafter while I put it in place. But when I found it impossible to even the the board up there by myself, I knew it was time to call my crew back for another session. Sure enough, in about 3 hours, we were all done. Finally, I was able to get the roof sheathing in place. If this were a flat surface, this job should have taken about 3 hours. But because it was on a roof, I had to laboriously move around and reconfigure scaffolding, haul materials up and install them, and then move onto the next part. Getting the plywood up for the roof sheathing was also challenging. I decided to make a simple lifting fixture from scrap 2x4s that I screwed onto the plywood, and then used a rope to pull up the plywood. I also set up a couple of long boards to help the plywood slide up to the roof. This lifting fixture also proved valuable in placing the plywood because it gave me some leverage. Note that I had to place on piece of plywood at a time using this method, so, again it took a long time.

Another thing I learned about working on a roof is that it’s physically hard! That’s because you constantly have to fight against gravity because you’re working on a slope. Plus, there’s no shade (duh!). So, in addition to it being hot, all of that up-and-down and muscling the plywood in place really wore me out. In the end it took about a week (!) to finish the roof. But I liked the result.

Outlookers in place, ready for the barge rafters. Note the "3rd hands" to the right and left of the scaffolding on the outlookers.

Outlookers in place, ready for the barge rafters. Note the “3rd hands” to the right and left of the scaffolding on the outlookers.

Barge rafters in place. Beginning to look like a house!

Barge rafters in place. Beginning to look like a house!

Shiplap appearance boards are on the roof overhangs to match the rest of the house.

Shiplap appearance boards are on the roof overhangs to match the rest of the house.

Roof all done! Looks nice.

Roof all done! Looks nice.

The inside. This is going to be a nice bedroom!

The inside. This is going to be a nice bedroom!

The proud builder and his creation.

The proud builder and his creation.

Phase 5: Install the connectors.

Actually, installing the connectors is something that I did as I went, but I wanted to highlight the fact that the days are gone when you can simply use nails to build a house. Modern house construction uses metal connectors almost everywhere, especially between major components (e.g., foundation to first floor, first floor to second floor, second floor to roof). There are hundreds of connectors to choose from, but that was taken care of during the design phase, so the ones that I’m using are all in my plans. Each connector has a specific fastening schedule (number and type of fasteners), so you have to be pretty meticulous. I made copies of the specification sheets for each connector that I used, and highlighted each one and keep them in my permit book so that when the inspector comes by, I can show him what I’m working to. I really did learn something when I prepared for my inspections in the Navy!

Metal connectors for the roof, studs, and top plate.

Metal connectors for the roof, studs, and top plate.

Connectors between gable and front wall. I still need to add connectors between the wall and the rim joist on the bottom.

Connectors between gable and front wall. I still need to add connectors between the wall and the rim joist on the bottom.

I’m hoping the pace will now pick up with the roof, windows, stucco, and HVAC contractors coming in. Stay tuned!

 

And The Walls Come Tumblin’ Down — A Short Discourse In The Art Of Demolition

Demolition. The word itself evokes images of fire and brimstone, mass destruction and the wailing masses. If you watch some of the home improvement shows on TV, you’ll typically see the homeowners doing some wailing of their own, albeit of a different ilk. Take that sledgehammer and just beat the living daylights out of everything you see and you’ll be a REAL remodeler! Well, I am here to tell you that what makes good reality TV makes a horrible approach to a demolition project. Swinging a crowbar and acting like a drunken oaf is a waste of time, effort, and money, and a more thoughtful approach can save you all three.

Enter the “art” of demolition. As with most things in life, a good demolition project starts with a good plan. It turns out that there is a lot to consider: How much and of what type of demolition byproduct will be produced? How do I get rid of it? How big of a dumpster do I need? Do I need a permit? (Typically you need an encroachment permit if you use  dumpster that goes on the side of the road.) Am I dealing with any hazardous material (e.g., lead or asbestos)? What are the areas to be demolished and how do you account for the new structure(s)? How does the demolition sequence affect the building sequence or vice versa? Am I removing any load-bearing structure that will need temporary bracing? What tools are best and do I have to obtain any? And this is not an exhaustive list. Is demolition a DIY proposition? Well, I guess that depends. If it’s a small project like remodeling a bathroom, then it definitely can be DIY. If you’re busting out a load bearing wall and building an addition, then it can be DIY, but you’d better have some previous experience so you have a pretty good idea of what you’re doing. If you’re going to demolish an entire house, well, that’s probably not DIY.

Equal in importance, or perhaps more, is safety. I cannot emphasize this enough. Perhaps I’m a bit anal when it comes to safety, and my background in industrial and military environments has given me a certain viewpoint about it. There are two ways to approach safety, protection and prevention, and it’s important that you incorporate both approaches because they work hand-in-hand.

First, protection. Protection is all about minimizing the dangerous effects of a hazardous environment. To be more specific, you need to protect yourself physically from the potential dangers of your work. Of all the protective gear that you can get, eye protection is probably the most important. Unless you’re reading your plans or answering your smartphone, I can think of very few construction activities that do not involve the potential for stuff flying around and getting in your eyes. Next on the list is probably gloves, followed by hearing protection and foot protection. For demolition in particular, breathing protection becomes a big deal, as does a hard hat. If you’re going to deal with hazardous materials, like lead or asbestos abatement, then add protective coveralls to your outfit. This is by no means an exhaustive list, so the best approach is to think carefully about safety before you start the job and make sure you’re properly outfitted.

Prevention means stopping a hazardous situation from existing or developing, and this requires constant thought about what you’re about to do next. If you’re going to be working on a ladder, then make sure it’s properly situated and don’t exceed the recommended standing height (i.e., don’t stand on the top step). Keep clutter to a minimum so you don’t trip and fall. That’s quite important during a demolition project, so the orderly and periodic removal of debris should be part of your plan. Make sure your cords from your electrical tools are out of the way so you don’t cut into them. If you’re going to work on the second story or roof, then consider renting scaffolding. Safety when working with power tools is all about prevention, and one must be constantly aware of where the dangerous parts of the tool are so as not to injure yourself or others. To sum up, I would say that prevention is more of an attitude and state of mind. You have to make it a priority and, really, always be thinking about it.

Wow. All that talk about safety got me fired up! Was it good for you too?

Now onto the real deal. Removal of a stucco wall that formed a balcony (i.e., a pony wall) outside my master bedroom was first on the list. While it may be tempting just to take a sledgehammer and wail away, there really was a much easier way to approach it. The first thing I wanted to do was to prevent the debris from falling on my new sidewalk, gate, and railing, so knocking down from the inside-out was a non-starter. What I decided to do was to disassemble it in basically the reverse order of the building, and then take it apart into smaller pieces that could be tossed onto the driveway. This meant taking off the top trim, which I would use later to weight down some visqueen on the driveway, giving me a large target to toss the debris onto, while helping to protect the driveway.

DSC_0039

House with balcony, before demo.

Balcony trim and top plates on a sheet of visqueen. This helps prevent damage to the driveway when I toss stucco slabs over the side.

I then pulled off the stucco from the inside of the wall to expose the framing. There is a technique for stucco removal, which I learned from my favorite stucco guy on YouTube, Kirk and Jason Giodarno. Here is a video:

There are two key elements to this technique: (1) cut the stucco into small enough sections so that you can move them around  — stucco is heavy!, (2) cut THROUGH the lath (wire mesh) that holds the stucco together. If you bash stucco with a sledge, you’ll get a bunch of stucco turds all connected by the underlying lath. Totally impossible to work with!

A 7″ grinder with a wet-dry masonry wheel. Essential for demolishing stucco.

Stucco all cut into sections for ease of removal.

First slice of stucco removed.

 

Inner balcony stucco removed.

Once the stucco was off the inside, I pulled up the lumber that connected the tops of the studs (top plates). I then cut the stucco from the inside, which is easier because the lath is closer to the inside, so you don’t really have to cut all the way through. Once I made another cut spaced by two studs, it was an easy matter to pull the section of stucco and studs inward. The weight of the assembly and the leverage I was able to provide caused the lath at the bottom to fail, and the whole thing just plopped down in front of me. Now I could knock off the studs and cut through the lath to make the stucco slabs small enough to handle.

Balcony debris. Because of the sequence, I had to walk over this stuff until I opened up a hole in the outer stucco so I could toss this stuff onto the driveway.

First section of outer stucco is removed. This gives me a “window” to toss the debris onto the driveway without having to lift it up and over.

The balcony wall safely in the protection of the dumpster.

The front of the house sure looks different with the balcony removed.

 

With the outside done (to a point), I started the demolition of the master bedroom which is really the main part of the remodel. Because I am a diligent homeowner, knowing that I had an older home, I tested the popcorn ceiling for asbestos. Actually, I was also motivated by the $25,000 fine that might be levied against me for improper asbestos disposal by the EPA. Sure enough, I had asbestos, so I needed to take some precautions. Now, before I get into the details about this being a DIY job, I want to make a few disclaimers.

  1. I have formal training and experience in asbestos removal and remediation from my Navy days. The older engine rooms used asbestos to keep the steam pipes insulated, and because I was the officer in charge of maintaining an engine room built in the 1950’s, I needed to know my shit.
  2. I have formal training and years of experience in handling and disposing of hazardous materials (HAZMAT) and nuclear waste.

Having gotten that off my chest, allow me to say that proper and safe removal of an asbestos popcorn ceiling isn’t particularly challenging from a technical standpoint. You just have to use some common sense and understand exactly what the hazards are so that you can protect yourself, and others, against them. The main thing to remember about asbestos is that it is the airborne particles that cause all the problems. And they are big problems. Basically, any asbestos particles that you inhale will stay with you for the rest of your life. They become embedded in your lungs and you can’t get rid of them, and their sharp edges provide a constant source of irritation that can eventually develop into mesothelioma and lung cancer. So, airborne particles are the enemy. Let’s go back to my original safety mantras of protection and prevention.

To protect yourself against asbestos, you need to be fully covered in a HAZMAT coverall with a hood, wear disposable gloves, have full goggle eye protection, and a respirator with filters.

All suited up for asbestos! I needed to have one hand ungloved to take the picture. Otherwise, I'm ready to go!

All suited up for asbestos! I needed to have one hand ungloved to take the picture. Otherwise, I’m ready to go!

The good news is that you can buy an asbestos removal “kit” online (PK Safety) for around $30. Since the popcorn material is usually low in asbestos (2% – 3%), you do not need a fully sealed, forced ventilation suit and mask (yes, I’m familiar with those as well). So, you’re getting off easy.

To prevent, or at least minimize contamination, there are two things that should be done. First, seal off the area, meaning tape some plastic over the door(s) to other rooms, and put a plastic dropcloth on the floor. This dropcloth simplifies disposal because you just wrap it up and double bag it, popcorn and all. Second, use some water from a garden sprayer to wet the popcorn. This not only helps keep the asbestos from getting airborne, but also makes scraping the damn stuff off pretty easy.

One last thing before I suited up was to make sure that I had EVERYTHING I would need at hand. Once you suit up and start, you don’t want have to stop in the middle because it’s usually difficult to get out of the suit, and even harder to put it back on (if you don’t destroy it when you take it off). Go to the bathroom, even if you don’t feel like it.

You’re welcome.

Tools for asbestos removal. A garden sprayer and scrapers. Pretty basic.

Tools for asbestos removal. A garden sprayer and scrapers. Pretty basic.

Trash can all ready to load the asbestos popcorn. Getting this ready before I suited up saved me some time and aggravation.

Trash can all ready to load the asbestos popcorn. Getting this ready before I suited up saved me some time and aggravation.

So, I mentioned that removing this stuff was not technically difficult. Just spray some water onto the ceiling to cover an area that you can reach with your stepladder, and take a wide-bladed scraper and ease the stuff off in big strokes. Then clamber down the ladder, being careful not to slip on the goop that you just plopped on the floor, move the ladder, and start again. Did I mention that the coveralls get hot, and that your goggles fog up and get poopy popcorn on them that you have to wipe off and you still can’t see? You get the picture. Technically difficult, no, but tedious and uncomfortable, yes. Much like other things in life, eh?

First section of asbestos popcorn removed. Note that the ceiling is saturated with water in the area that I'm working.

First section of asbestos popcorn removed. Note that the ceiling is saturated with water in the area that I’m working.

The bedroom ceiling free of that nasty asbestos popcorn.

The bedroom ceiling free of that nasty asbestos popcorn.

Once all of the ceiling is scraped, you need to roll up the poopy popcorn in the plastic dropcloth and stuff it all in a big garbage bag. You will probably have to do this by sections because of the volume and weight and use several (3-4) large garbage bags. Remove your coveralls and gloves and stuff them in the last bag. Then seal with duct tape and double bag.

Now it’s time to dispose of this crap. Fortunately for me, my city has a residential hazardous waste disposal program, so all I had to do was take it to them and they unloaded the bags of objectionable material from my Prius for free and thanked me for being a conscientious citizen. One last word of caution: make sure you know the rules for disposal in your jurisdiction as there may be some extra costs and procedures. It’s probably a good idea to do this beforehand.

So, for a $30 hazmat kit, I did the work myself and saved about $1,700. Not bad for a DIY’er on a Saturday morning. But, again, I have formal training and experience in this sort of thing, so, if you have ANY DOUBT about what you’re doing, PLEASE engage the services of a professional!

On to drywall removal. This is where the home remodeling shows on HGTV show the owners having at it with sledges and crowbars. Good for them. I hope they got their exercise for the day. Conversely, I decided to use an easier method, which involves using a sawzall to cut the drywall into smaller panels and then use a crowbar to yank from the back and pop the nails out. This results (mostly) in large sections which are much easier to handle. However, before you plunge you sawzall into the wall, you really need to try to figure out where your electrical, plumbing, and telephone/cable/data lines are so you don’t cut them. The best method is to cut out a little section of drywall by hand near where you know these services are and get an idea for which way the lines are going so you can avoid them. As more of the wall comes off, it becomes easier to see what’s behind and where it’s going. For safety, its a good idea to kill the electrical power to the area you’re working on, just in case you run into an electrical line.

Essential drywall removal tool. You need to use this first to locate your hidden service lines before you attack with a sawzall.

Essential drywall removal tool. You need to use this first to locate your hidden service lines before you attack with a sawzall.

The drywall is cut into sections to ease removal.

The drywall is cut into sections to ease removal.

Because of the cuts, the drywall comes off in big slabs. For the most part, at least.

Because of the cuts, the drywall comes off in big slabs. For the most part, at least.

All drywall removed.

All drywall removed.

 

Finally, structure removal. The first piece of business is to make sure that know whether you’re removing a load bearing structure or not. But what does load bearing mean and how can you tell the difference? The the answer is sometimes not so simple. Sure, the exterior walls support the roof and/or second floor, and that load has to be transferred through the walls to the foundation. But without a more nuanced understanding of structures and mechanics, well, the explanation is beyond the detail that I wish to chronicle in this blog entry. I reserve the right to wax poetic on structural theory and practice in the future. In the meantime, if you don’t understand it, then hire somebody who does know and follow their advice. You don’t want your roof to fall down upon you and ruin the rest of your day. Plus, you will be very sad.

The wall I had to remove was NOT load bearing, so that simplified the process significantly. Again, I approached the demolition with an eye to safety, simplicity,  and ease of removal. The wall was attached to the bottom chords of the trusses by some cheap connectors, so all I had to do was to pry out the nail securing each connector to the truss. But, since I didn’t want the entire wall to fall down on me, I used my sawzall to cut the double top plate so that the wall could be lowered in sections (and handled by one person safely). Each wall section came down smoothly, and from there, it was simply a matter of banging apart the structure with a hand sledge (a.k.a. “engineers hammer”) so that I was dealing with individual pieces of lumber. The good news here is that (a) I was able to salvage some of the longer timbers for use in a support that I will have to build when I bust down some exterior (i.e., load bearing) walls in the future, and the remainder I was able to give away for free on Craigslist, which minimized my dumpster waste. Here are some pictures.

Wall framing cut into sections for ease of handling by one person. Note the section of framing on the floor.

Wall framing cut into sections for ease of handling by one person. Note the section of framing on the floor.

Section of wall framing on the floor, ready to knock apart.

Section of wall framing on the floor, ready to knock apart.

Wood I salvaged from the framing demolition. I advertised it for free on Craigslist, and it was gone in a day.Wood I salvaged from the framing demolition. I advertised it for free on Craigslist, and it was gone in a day.

Is it safe to come in?

Is it safe to come in?

 

 

This was our bedroom?This was our bedroom?

I know you say it's going to be great. I'll believe it when I see it!

I know you say it’s going to be great. I’ll believe it when I see it!

“Little Projects” — Another Part Of A Home Remodel

Thus far, most of my posts have been focused on progressing the home remodeling project as a whole. However, as with any thorough home remodeling, there will be a few things that will be seeming unrelated to the main project, and these stem from the inspections that occurred in leading up to the start of the overall project.

In this example, I had a plumber come in and inspect my domestic water drain lines (not to be confused with site drainage for runoff). I actually did this quite a few months ago because I wanted to know if I had any major work lurking in the background and would have to perform additional digging to fix my drain lines. The good news was that my drain lines were in excellent shape. No clogs, build-up, roots, or other “growies”. In fact, I did not need a drain cleaning! However, there was one part of the drain, right below the kitchen sink, that had a crack and was leaking. My plumbing contractor (Eastlake Plumbing)came in and did an AWESOME job fixing the drain. In fact, they re-routed some of the drain in order to fix a problem that the original builder left behind. However, I had to cut a hole in the stucco on the outside wall near the drain in order to give my plumbing heroes the correct access. That left a big hole in the side of my house. I wasn’t sure exactly how to fix it, but I had bought some cheap plywood and some goop with the hope that I could just seal it up and have it done properly when I hired a stucco crew to stucco the addition and “fix” some other problems.

I had deferred this project because I wanted to keep my momentum going with the brick wall and front yard. That turned out to be a good move because, lo and behold, my favorite YouTube stucco guy Kirk and Jason Girodanos posted a video on how to do a stucco repair after a plumbing job. He gave me some key pointers, but more importantly, showed the job from start to finish so that I had a really good example from which to proceed. I bought my materials, and then finally, this past weekend, had a chance to actually start on this project.

The first thing to do is to chip away the stucco from the perimeter of the cut so that you can slide some building paper underneath. Unfortunately, as I broke away stucco and exposed the underlying structure, I found that it had been adversely affected by the water which was constantly leaking out of the drain. Plus, for whatever reason, the original stucco only had one layer of building paper underneath, instead of the required two layers. So I had to remove a lot more stucco than I planned on in order to expose solid material from which to work with.

The other problem was that there were several studs, plus some of the sole plate and the weep screed, which were totally rotted out. Thus, I had to deal with the structural issues first, before I could move forward with the stucco repair. At least my carpentry skills are fairly well-developed, so I was able to cut away the offending materials, and rebuild the ends of the studs by wedging in “cripple” studs at different lengths to form what looks like a finger joint. This gave me some resistance to shear forces, in addition to the gravity forces which were taken by a new sill plate that I attached to the foundation using a “gunpowder” hammer. I also had to cut notches in the new studs to accommodate electrical wiring and then secure them with nail plates.

Demolition is complete Note how the rotten sole plate and studs are removed, and that I cut the studs to make interlocking "fingers" that will provide lateral strength.

Demolition is complete Note how the rotten sole plate and studs are removed, and that I cut the studs to make interlocking “fingers” that will provide lateral strength.

Rotted out studs. Like swiss cheese!

Rotted out studs. Like swiss cheese!

 

 

 

 

 

 

 

 

 

 

New sole plate installed. This is a "powder activated" hammer, meaning that it uses a .22 caliber shell to power a hammer. The nail has an orange centering bushing that holds the nail in the "muzzle" of the hammer. You whap the end of the tool with your regular hammer, and that fires the shell and drives the nail right into the concrete. I bought this years ago for attaching furring to a concrete wall, and I've used it countless times since. A must-have if you want to attach something to concrete.

New sole plate installed. This is a “powder activated” hammer, meaning that it uses a .22 caliber shell to power a hammer. The nail has an orange centering bushing that holds the nail in the “muzzle” of the hammer. You whap the end of the tool with your regular hammer, and that fires the shell and drives the nail right into the concrete. I bought this years ago for attaching furring to a concrete wall, and I’ve used it countless times since. A must-have if you want to attach something to concrete.

Replacement studs, interlocked, nailed, and notched for the electrical wires.

Replacement studs, interlocked, nailed, and notched for the electrical wires.

Nail plates over the wires. Required by code, but also did a good job of keeping the wires in place. Note that I'm fitting the building paper.

Nail plates over the wires. Required by code, but also did a good job of keeping the wires in place. Note that I’m fitting the building paper.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The next step was to shove 2 layers of building paper underneath the original building paper at the top edge of the cutout. I thought this would be a major problem, but it turned out to not be so bad. For me, the key was cutting everything the right size and breaking it down into a few separate sheets to make it easier to handle and position.

From there, I had to staple on some lath. I got this lath at a discount because it was folded over and wasn’t a continuous sheet, but for my purposes it was OK. Again, cutting and fitting took several iterations, and I used a number of individual pieces to make things easier to work with. And a lot of staples.

Building paper in position.

Building paper in position.

Lath installed. Ready for stucco!

Lath installed. Ready for stucco!

 

 

 

 

 

 

 

Finally, time to put on the actual stucco. I bought a couple of boxes of “stucco patch” which has only a 20 minute working time, so ya gotta work fast! I used my “eggbeater” mixer and a 5 gallon plastic bucket to mix the stucco and then went to work. Kirk and Jason Girodanos  use what is called a “pool trowel” and that worked like a champ! So, I got everything on, but I ran out of stucco mix, so I have a big concave area in the wall where the patch is. NBD because (a) the patch is fully functional (waterproof and no holes), and (b) I’m going to have a crew come in and stucco the addition, so I can have them go around the house and fix all of my other stucco problems. Honestly, I don’t know how to apply the finish, and I have other demands on my time. Again, this is an example of making smart decisions about what you do yourself, and what you contract the pros to do. When it comes to portland cement products, I will typically defer to a pro who has a crew that can get the job done before everything turns into an unworkable and ugly slag heap. I speak here from experience.

Stucco in place. Looks like crap, but it's functional and it's concave so the pros can cover it up and make it look nice. I'm calling this the "brown" coat for obvious reasons.

Stucco in place. Looks like crap, but it’s functional and it’s concave so the pros can cover it up and make it look nice. I’m calling this the “brown” coat for obvious reasons.

 

 

 

 

 

 

 

 

Next up: the big Concrete Pour!