Removing Recalcitrant Concrete Forms — How to Adapt and Change Your Approach

This week was a bit of an interlude. I had just finished one project (the new patio cover/trellis supports and footings), but I really wasn’t ready for the next one (building the backyard retaining wall). Nonetheless, there was a lot of work to do. I had to determine exactly where the backyard retaining wall would go based on how much dirt I had to accommodate from the net result of my adventures in grading (see previous posts). So, early in the morning, I went out with my AWESOME laser level and grade rod and determined the level of my retaining wall, and then went back to my computer model to set the dimensions of the retaining wall based on the volume of dirt I had to re-distribute. I then calculated the number of retaining wall bricks and capstone that I would need.

I also had to demo the old footings with a jackhammer. It cost $75 for 4 hours — if I would have done this earlier, when I had the jackhammer for other reasons, I would have saved the $75.  That is (part of) the price of not thinking ahead. Oh well. I also had to sort through a bunch of other demolition products, primarily lumber, so Habitat for Humanity could pick it up. To meet their requirements, I had to disassemble all of my structures (e.g., concrete forms), and also had to rid some of my other used lumber from nails and screws. I don’t want to pay somebody to take this lumber to a landfill where it will rot and pollute our environment, instead of being repurposed for someone else’s needs. My lovely wife is the great conservator and recycler, and I always follow her recommendations. Over the years, I have come to truly appreciate her wisdom and forward-thinking about our care for our environment. It makes a difference on many levels.

A big pile of busted up footings. Will I ever get rid of this stuff?

A big pile of busted up footings. Will I ever get rid of this stuff?

All the lumber I used for my concrete and footing work, ready to be repurposed by Habitat for Humanity.

All the lumber I used for my concrete and footing work, ready to be repurposed by Habitat for Humanity.

Part of my demolition activity was to remove the forms from the concrete pour. In particular, I had to remove the forms which made a recess in the concrete to fit in my footlights. These were all left in place when the outside forms were removed because it was important to have the concrete cure and gain maximum strength because removal of these forms places a stress on the surrounding concrete. Thanks to my naiveté,  I did not seriously consider the potential difficulty in removing these little forms. After all, they were just little plywood boxes held together with a few finish nails. And the concrete contractor did a good job of spraying release agent (diesel fuel — you can smell it when you pull the forms), so I figured no big deal. I’ll just yank these bad boys out by inserting a few screws and pulling with pliers.

This approach did not work out well.

Turns out that the fresh concrete has water (duh!) which gets absorbed in the wood, no matter the release agent. This causes the wood to expand, and, unless you live in a desert (I do) and are willing to wait for several months to let ALL the moisture evaporate (forget that — I have a schedule to keep and I’m impatient), then you will have to remove the forms using brute force. This was an “inside” form, meaning that when it expanded, it only forced itself tighter against the surrounding concrete. I tried a couple of methods which involved a somewhat clever use of jackscrews that would push out the form from behind, but all ended up in failure. If I would have foreseen this complication, I could have installed the correct hardware before the pour, but I didn’t, so I was stuck. In the end, the brute force method was the way to go.

Brute force means removal by destruction. Basically, you use an array of tools, (hammer, crowbar, hand-held jigsaw, drill, chisel) to cut up the form and lever it out. Without doing damage to the concrete, of course. I would cut the top and bottom of the plywood with a jigsaw and then crowbar the top and sides out. For the back, I would drill a horizontal and vertical line of holes, and then use a chisel to break the plywood along the drill lines. The remaining pieces could then be pried out. So was this DIY hell, or was it what the pros do?

In a word, yes to both.

I had a basic misconception with how difficult the form would be to remove based on overlooking the expansion of the wood due to moisture in the concrete. My initial attempts did not take this into account. After trying the alternative jackscrew approach (the screws would either strip or shear off), I found that the brute force demolition approach was not so bad. This is what I think pros do in this situation. So I eventually came up with a “pro” approach. It just took me a few iterations. And a lot of time. Which is why pros are always faster. But I had “fun” doing it, right? Truthfully, no, but I learned something, and that is one of the benefits, if not a joy, of being a DIY.

Here are some pictures and a video:

Here is an "after" picture. Note how the edges of the well are a bit rough. I'm going to have to figure out how to hide this. Hiding your mistakes is an essential part of being a good DIY'er. Hey -- even the pros do it!

Here is an “after” picture. Note how the edges of the well are a bit rough. I’m going to have to figure out how to hide this. Hiding your mistakes is an essential part of being a good DIY’er. Hey — even the pros do it!

The detritus from the destructive removal of the concrete forms. That entire project turned out to be a "well spent" afternoon (!)

The detritus from the destructive removal of the concrete forms. That entire project turned out to be a “well spent” afternoon (!)

 

I’m trying to get a little more traffic on my blog and I ended up getting a domain name: http://www.diydivo.com.  It’s easier to remember, so please visit often!

 

Playing Footsie With Footings — Attention Shifts To The Back Yard

Now that the concrete pour for the front and service sidewalk was complete, my attention shifted to the back yard. In my master plan (that which I jealously harbor in the dark recesses of my brain), I was going to start building a retaining wall, However, when I surveyed the situation with an eye to actually start work, the ugly footings for my patio cover and trellis began to weigh heavily. Little did I know.

There were several things wrong with the way my patio cover and trellis were supported. First, many of the posts, were warped and rotted. So, at some point, replacing them was inevitable, Second, the footings were now protruding above the finished grade as a result of lowering the level of the grade to accommodate a code-compliant drainage system. This not only was aesthetically unpleasing, but was also a trip hazard. Third, embedment of the footings no longer met code because I removed some of the soil that surrounded them, so they really had to be buried deeper. Fourth, the footings were cylindrical, making it difficult to fit the rectangular bricks of the patio around them. I had originally planned to just replace the posts and live with the substandard footings. But after all the work on the front yard, I couldn’t stomach a backyard with second-rate footings. So I decided to do the “right” thing, and replace the footings.

This became a very interesting project because it was a retrofit, and thereby was not amenable to  a “standard” sequence of events. By this I mean you first do the layout, the dig and pour footings, and then build up from there. For this project,  I had to do things a bit out of sequence, which required some “backyard engineering”.

The first challenge was to remove the existing posts. To do that, I had to figure out a way how to support the existing structure with the old posts out while I was removing and replacing the footings. The second was to extract the footings. I didn’t want to dig them out, so I wanted to figure out a way to pull them out. The third was to pour the footings. I didn’t want to wait a day for the concrete to harden, because I would be only doing 2 footings at a time. So, I needed to use fast setting (high-early strength) concrete. Fourth, I had to figure out how to do all of this in the context of a one-guy operation.

Let’s face it. I love it.

To support the existing structure while replacing the posts, I came up with a system of jacks. These jacks consisted of a post made of 2x4s separated by 1/2″ plywood to give a square (3-1/2″ x 3-1/2″) bearing surface to match the beam, a “shoe” which was made of 2x4s and 3/4″ ply that incorporated an axle for the post to allow it to pivot, and some 1/2″ ply attached to the top of the post to act as a guide. I cut off a corner on opposite ends of the jack post to allow me to rotate the assembly in place underneath the beam. It’s way harder to explain in words, so here are some pictures:

Picture of the post jack. The top will be hammered into place vertically after shimming  to ensure good support.

Picture of the post jack. The top will be hammered into place vertically after shimming to ensure good support.

Picture of the shoe of the post jack. The bolt allows the jack to pivot into position, and the shoe provides a stable base.

Picture of the shoe of the post jack. The bolt allows the jack to pivot into position, and the shoe provides a stable base.

 

 

 

 

 

 

 

 

 

 

This shows the top of the jack, with the corners of the jack post cut at 45

This shows the top of the jack, with the corners of the jack post cut at 45

 

 

 

 

 

 

 

Next up was to remove the old posts. This turned out to be more difficult than originally planned because the connecting hardware I used was meant to stay in place. Additionally, I had to do all of this while perched on a stepladder that was placed awkwardly because of the jacks and other assorted obstacles.

To get the footings out, I wanted to pull them up, and not dig them out. After seeing a few techniques on YouTube, I came up with the idea of using a winch (come-along) and hang one end from the beam above, and attach to the footing using the anchor bolt. I repurposed a couple of heavy-duty angle braces, some chain and some shackles to hook up the come-along to the footing, and I used a lifting sling to hang the entire contraption from the beam. This is a good example of “seat-of-the-pants” engineering. I did some very rough estimates in my head: some nominal weight for the footing plus whatever load would break the footing free from the ground, I figured maybe 1000#. Then got everything about 5x that (8000# come-along, 6400# lifting strap, 5000# shackles, etc.). No calculations for how much stress would be on the nut holding the plates to the anchor bolt. No calculations on the loads I would be putting on the beam or the jacks when I hauled the thing up. Never mind that you’re not supposed to use a come-along for lifting stuff. Just get everything big and pray that something doesn’t bust. Fortunately, it all worked out pretty well, and with 8 of these things to pull out, making up the rig was a great idea and a real time-saver.

Then I had to dig, form up, and pour the new footings. My recent work with concrete forms helped because I had already come up with a design concept and had built a couple of re-useable forms that I could easily take apart and put back together. I set the form on the ground and aligned it using a DIY plumb bob (weights attached to a string) hanging from where I wanted the post on the beam. I set the height of the form to the finished grade and leveled it using my new laser level (my Father’s Day present), and then dug a hole 12″ deep by 12″ dia and slipped a tubular concrete form into the hole. Then I placed the rectangular form on top and staked it in place.

Now came the fun part. I had to fill the forms and I had to hustle because I was using fast-setting concrete mix. After some experimentation, I came up with a plan to mix 3 bags at a time in 3 batches. I would always start the next batch so it was mixing while I was shoveling the mud from the current batch into the forms. What made it even more challenging from a time perspective is that I was working with a “hot” mix with the 2nd and 3rd batches. A hot mix occurs when you start a new batch of concrete in the mixer with residual concrete from a previous batch. The residual concrete already has a chemical reaction going, and that acts as a catalyst (or accelerator) for the new mix. This also occurs on the jobsite for large concrete pours, especially if you have trucks that are cycling through because they won’t take the time to wash out the truck before putting in the next load. This video shows me in action pulling and pouring the footings:

Sure enough, by the time I had cleaned up all of the concrete mess from the mixer and tools, the new footings had hardened to the point where I could pull the forms and mount the base to the anchor bolt. From there, it was relatively easy to measure, cut, and install the new posts. Then it was on to the next set of posts. Doing two at a time, it took me 2 weekends to finish, but this was one of the few projects that I completed within my original time estimate. That’s including several trips to Home Depot (I had to get more concrete and different size posts), troubleshooting and fixing an electrical problem with the cement mixer, removing old surface mounted electrical conduit, and dressing up and re-cutting the threads on the anchor bolts which I had managed to mushroom while banging them in. The concrete had already began to set, you see. At any rate, it’s all done and it’s the first step in actually building something in the back yard. Here are some photos.

Patio Cover Footings -- Before.

Patio Cover Footings — Before.

After -- New posts and footings for the patio cover.

After — New posts and footings for the patio cover.

 

 

 

 

 

 

 

 

 

New footings and posts for the trellis.

New footings and posts for the trellis.

 

 

 

 

 

 

 

 

 

The next thing I do will be to build the back retaining wall. This will be another back-breaking, dirt digging, block hauling adventure. At least I get some good cardio and strength training! I’ll try to post as soon as I can about it!

The Concrete Pour — A Very Gratifying Moment

In the course of most, if not all, projects, there are moments when all of the hard work of preparation become manifest in a sudden and visceral way. Such is the case with my “big” concrete pour. Well, “big” is relative. Many concrete pours are measured in hundreds of cubic yards and many concrete trucks. Mine was about 10 yards, which was a pretty full truck, but, hey, have you ever had to move 10 yards of anything by hand? To me, this falls into the category of “big”.

This was “big” in another context as well. It marked a big turning point in the outdoor part of the project because, in a matter of a few hours, it transformed the front of my house from a bunch of shabby looking trenches into something that was actually warm and inviting. And that’s how projects go. Lots of preparation with little apparent visual progress, and then, boom. it’s all done.

The first thing I needed to do was to find a suitable contractor who would do the pour and finishing. I have tried to do some concrete work by myself, or by enlisting the help of some of my family members and friends. Some of these turned out OK. Others were major disasters. Bottom line is that through experience, I had learned that a concrete pour, especially of the size which I had planned, was something left to the pros. There are things that are NOT DIY and this is one of them! Concrete has a relatively short working time, and the crew that showed up numbered 9 people, if you include the truck driver, pump operator, and the owner/supervisor. No way can that be duplicated at the DIY level. I got a few bids by calling some contractors that were advertising on Angie’s list, and I chose a company that (a) showed up on time, (b) gave me an estimate that was competitive and (c) told it like it was. The owner had been in the concrete business since he was a teenager and knows concrete from the bottom-up, inside-out, over-under, well you get the idea. Here is a link to his website in case you’re interested. The owner’s name is Dave Parker and he gave me several suggestions on how to improve some significant details of my design (which I took on board). We had sealed the deal and, because I had everything set up, he was able to work me into his schedule last Saturday.

Saturday morning arrived, and it was a good thing that I am on an “early” schedule. My alarm goes off at 4:00 AM and I’m usually on the job not later than 6:00 AM, whether that be my day job or my remodeling adventure. The crew arrived at about 6:45 AM and I walked the foreman through the project. As additional workers started to show up, they started doing the layout. Although I had set the forms, they snapped chalk lines against the walls to make sure they had a good reference to work to, and did some clean-up. Eventually, the owner shows up and gives his crew some specific directions based on my walk-through with him a couple of days before. Then comes the concrete pump. Nowadays, concrete pumps are ubiquitous. No pros EVER use anything but a pump. It’s a relatively small part of the total job (for me about 17% of the total cost) and that would be about the same as the labor for barrowing the stuff around. At any rate, the concrete pump and the associated truck which pulls it takes up a significant amount of frontage. Then comes the concrete truck. Fortunately, I had made good use of my traffic barriers to block out any stray cars from the front of my house, as well as my two adjoining neighbors to fit the whole rig in. But,hey, it was early on a Saturday, so the first inkling that they had regarding my occupation of “their” parking spaces was a big concrete truck  in reverse with its warning beepers at full blast. So much for sleeping in. Such is the price of progress.

So things were getting exciting. For the rest of the event, I invite you to watch the following video.

To me, working concrete is an amazing skill. Or perhaps it is art. Your medium is this heavy, messy, wet stuff that looks like, well, you can draw your  own conclusions after reflecting on the video of the stuff coming out of the hose. Yet a good concrete finisher will direct the pour to align the edges perfectly to the forms and/or lines, and then sculpt swales and mounds to get the water to drain properly. The stuff has a certain working time, so one has to be cognizant of that and work accordingly (usually fast). However, there is a “sweet spot” of time when the concrete just begins to harden, and that’s where the magic of a good finisher shows itself. The guys I had were expert. They poked, prodded, screeded, floated, sculpted, troweled, cut control joints, finished the edges, and finished it off (I wanted a broom finish*) in what seemed to me a well orchestrated ballet. Literally, they were dancing on top of the forms and whatever else the could gain purchase on to do the finishing under the pressure of the clock. Baryshnikov would have been proud!

Here are some pictures of the finished product:

Finished  Front Sidewalk and Ramp

Finished Front Sidewalk and Ramp

Finished Side Yard

Finished Side Yard

 

 

 

 

 

 

 

I’m really happy about how this came out, and it represents a big step because it is not only the culmination of a lot of hard work,  but also had an immediate, positive, visual impact on how the project is shaping up.

Now… onto the back yard!

* A broom finish is where you take a stiff bristle broom and push it across the wet concrete. The result is a surface with a lot of tiny parallel grooves which produce a non-skid surface. This finish is standard for any concrete which will have foot traffic. Your driveway is probably finished like this as well, because you’re probably going to walk on it. However, on public roads, the shallow grooves of the broom would wear down rapidly. So, the builders will frequently cut big grooves with a concrete saw to not only provide traction, but also to shed water, which, when it rains,  is a significant hazard.

Getting Ready For A Concrete Pour

Things are beginning to shape up in front, and one of the final “projects” was going to be to pour the concrete. This is DEFINITELY a job for a professional crew — NOT DIY! I know this from harsh, personal experience. Oh, I know, the videos make it seem really easy, but trust me, striking off a mound of concrete with a screed is hard, messy work, and is actually quite comical if it’s just you and your wife doing it. OK, I’ve done a couple of small sidewalks, but this job is way too large and intricate to trust to anybody but a professional crew. Hey, at least give me credit for knowing the difference!

Be that as it may, I had my plans, so I know what I wanted to do. Well, at least I thought that I did at the beginning. More on that later. The fact is that a dedicated DIY’er can do essentially all of the prep work. This is quite a lot of work, it turns out, and while you may get some benefit of saving some money, the biggest advantage for me was giving the concrete subcontractor a lot of flexibility with the schedule. If you have a pro do the whole job (demolition, site and grade prep, base fill, building the concrete forms, and setting out the remesh), then you’ll have to wait several weeks until the schedule is clear for a multi-day (or week) job. If you do all of the work, it’s a 1 day job of pouring and finishing the concrete, which can be scheduled more easily. Now for all of that prep work.

Demolition was done previously, per several of my previous posts. And, although I did a reasonable job of getting the grade set correctly with the steer skid, I still had a fair amount of cleanup to do. The skid steer doesn’t get into the corners, plus I had to get some stumps ground after I had completed the initial excavation. Plus the rains over the winter (such as they were) ended up “displacing” some dirt which had to be “re-placed”. In other words moved around some more. I ended up barrowing out about 4-5 yards of dirt to the back.

Will I EVER get rid of this dirt?

Will I EVER get rid of this dirt?

 

 

 

 

 

 

 

The next thing to do was to set up a base. I had a choice between 3/4″ gravel and “class II  road base”. I decided to use gravel because I though it might be better, but it turns out that class II road base is what is typically used around here because gravel is used for areas where frost heave is a problem, and you want something to absorb the resulting ground motion. Road base is less expensive (!), and since it compacts way better, I plan on using it as the base for my brick-on-sand patio. So I find this out too late and I now have 7 yards of gravel to chuck  and spread around. C’est la vie! Fortunately this went reasonably quickly. The only hiccup was that I had to somehow figure out a way to get wheelbarrows of this stuff to the back while navigating around previously installed drainage pipes that were annoyingly protruding from the ground. My solution was to barrow a pile of gravel around the drains and then take some plywood and make little ramps so that I could gingerly push a wheelbarrow with several hundred pounds of gravel through the maze that eventually lead to the back yard. After all was distributed, I rented a plate compactor to give a good solid base.  Because the compactor wouldn’t fit into the corners, or around some of the obstacles sticking up, I had to use a hand compactor to get everything nice and tight.

That there is a cubic butt ton of gravel to move!

That there is a cubic butt ton of gravel to move!

Chucking gravel from front to back. Note the plywood highway.

Chucking gravel from front to back. Note the plywood highway.

 

 

 

 

 

 

 

I used a pile of gravel and some plywood ramps to navigate around the drain grates that were sticking up. I ended up raking the gravel level as i worked my way back, so it ended up all good.

I used a pile of gravel and some plywood ramps to navigate around the drain grates that were sticking up. I ended up raking the gravel level as i worked my way back, so it ended up all good.

 

 

Front entrance gravel all level and compact. Ready for the forms.

Front entrance gravel all level and compact. Ready for the forms.

 

 

 

 

 

 

 

 

While I was gearing up to move all of this gravel, I also had to buy lumber for the forms. So, I woke up early on a Saturday and headed over to the local Home Depot. Alas, it was raining, so it promised to be a mucky day outside. As I drove into the parking lot, I saw that the rental truck was conveniently parked, so I assumed it was available. I loaded up a bunch of lumber (plywood, 2x4s.), paid for it, and tried to rent the truck. I was then told it was out of commission for some obscure reason. Since my mood sufficiently sour to begin with, I vented my frustration. The customer service people were very nice, let me have my say, then proceeded to help me out with a free delivery. How good is that? So, shame on me for being a dickhead, but good for the Home Depot folks. I sent their boss a nice e-mail apologizing for my brief outburst and profusely thanking them for their excellent customer service. At any rate, I come back to the house and discover that my brand new wheelbarrow has a flat tire that will not succumb to mere inflation. So it’s back to Home Depot to get a flat-free tire. I guess it just was going to be one of those days….

 

My new wheelbarrow with a flat tire. Come on!

My new wheelbarrow with a flat tire. Come on!

 

 

 

 

 

 

 

Next was the forms. With my previous experiences with concrete, getting the forms right was always a challenge. So this time, I wanted to make them very sturdy and straight. I used 1/2″ plywood and made a frame of 2x4s to support the plywood so there would be no bending. The 2×4 frames also gave me something solid to work with so when I drove the stakes, I would be using the forms as the guide. The contractors who came out to bid basically said that this was overkill, and they may have been right. But as a DIY guy working alone, I think this gave me the best result and minimized the amount of fussing around to get the forms aligned and in place.

Frame for the form. I had to eventually rebuild this one because it was too large, but you get the idea.

Frame for the form. I had to eventually rebuild this one because it was too large, but you get the idea.

Detail of my forms. The corners are bolted together with braces that pull everything tight and square, and make disassembly very easy. Too bad I won't be using these again.

Detail of my forms. The corners are bolted together with braces that pull everything tight and square, and make disassembly very easy. Too bad I won’t be using these again.

 

 

 

 

 

 

 

 

 

 

Bottom of plywood on form extends down to allow for concrete to flow between levels to allow a monolithic slab without a lot of fuss in removing the form to finish the faces.

Bottom of plywood on form extends down to allow for concrete to flow between levels to allow a monolithic slab without a lot of fuss in removing the form to finish the faces.

 

 

 

 

 

 

 

 

One of the nuances of my design was that I wanted to place can lights within the concrete to provide lighting for the steps (as a safety feature). Although the lights that I chose were rated for casting in concrete, in the long run, that is a bad idea because when (not if) they fail, you’ll have to tear out the concrete to get to them. No thanks. So, my plan was to construct plywood molds that would result in a perfectly sized recess that I could fit the lights into. Additionally, the molds had a hole that accepted PVC conduit, so that I could run the wiring between the boxes and back out through the wires that I had cleverly routed around the house while I was digging the drainage lines to supply the power. This is 12v lighting, so no problem with running the wires adjacent to where water might be. However, on the back porch, the lights needed to be located near the top of the slab. This could be problematic with cracking, so I added a 1×1 wire mesh reinforcement with material I had left over from a previous project. I also knocked down the sharp edges of the plywood boxes to minimize stress concentrations. My hope is that, with these little details, plus the fact that I am going to tile over these fragile areas, will make everything all right.

After I had set up the forms, I and my wife had a good chance to look at what the final result might be and, you guessed it, we were having some reservations. So, we took a step back, and perhaps some steps around, and started to actually walk through the expected traffic patterns. After a few iterations, it became obvious that we had to change things around a little in the front, and that is one of the advantages of DIY. You really can change things at almost the last-minute without a great impact on cost or schedule. Had this been an agreed upon design and had I already had a contractor doing the work, changing this stuff would have been out of the question. Of course, perhaps my design was not so good to begin with, and maybe a pro would have come up with the right answer in the first place, but what fun is that? I also had to re-design (and re-build) the forms to have the proper height above the finished concrete surface and provide a gap underneath so that the pour could be continuous, resulting in a monolithic slab. Good thing I had ordered some extra lumber!

The front landing is disjointed and not ergonomic. It looked better in the model and plans.

The front landing is disjointed and not ergonomic. It looked better in the model and plans.

Just doesn't look right.

Just doesn’t look right.

 

 

 

 

 

 

 

That's more like it! Nicely balanced and allows access up the ramp (on the right), from the driveway apron (on the left), and from the garage.

That’s more like it! Nicely balanced and allows access up the ramp (on the right), from the driveway apron (on the left), and from the garage.

 

 

 

 

 

 

 

 

While I was doing all of this, it was time to get some bids for the work. I had a number of folks come by, and each was very helpful and offered some advice as I was finishing up. One comment was pretty much universal: “Fill in the areas where you have deep concrete (e.g. the back porch and front landing) with materials that are less expensive than concrete. Well, it turns out that I had a big pile of masonry detritus  accumulated from my previous work, so it was a no-brainer to chuck that stuff into these areas, if not to save money, than to just get rid of the stuff in a manner that did not involve surreptitiously dumping this crap into the residential waste stream over a long period of time. Which is my normal modus operandi. I learned this from my wife.

Finally, the re-mesh. This is a welded wire mesh that is used to provide reinforcement in the concrete. It is made of large gauge (#6) steel wires that are spot welded together to form a  6″x6” mesh. You can buy these in flat sheets of 5’x8′, but that is much more expensive than buying a 150′ roll and cutting it yourself. Of course, I did the latter. I had previously purchased a heavy-duty wire cutter (essential for this work) and set about unrolling the beast and nipping off sections so that they fit where I needed to put them. I ended up with a number of relatively small pieces because (a) they were easier to make flat — the roll has some “memory” so you have to bend it a little to make it lie flat — and (b) they were easier to handle and place where I needed them.

Back porch ready for the pour. Can you see the masonry detritus poking through the gravel? Also a good look at the forms and reinforcement for the can lights.

Back porch ready for the pour. Can you see the masonry detritus poking through the gravel? Also a good look at the forms and reinforcement for the can lights.

Left driveway apron all ready for the pour.

Left driveway apron all ready for the pour.

 

 

 

 

 

 

 

 

 

 

PVC electrical conduit is supported by rebar stakes so that it won't bend when the concrete is poured over it.

PVC electrical conduit is supported by rebar stakes so that it won’t bend when the concrete is poured over it.

Service sidewalk all ready. I'm replacing the square grates with round ones on the advice of the subcontractor to minimize cracking.

Service sidewalk all ready. I’m replacing the square grates with round ones on the advice of the subcontractor to minimize cracking.

 

 

 

 

 

 

 

 

 

 

Now everything was all set and the bids were in. It was time to choose a subcontractor. I chose a person who (a) provided a reasonable price (part of my day job is cost estimation, so I knew what the price range should be), and (b) would provide a schedule (e.g., meeting time, estimates), and stick to it. I believe the latter is a key indicator of future performance.

I’m meeting with the subcontractor tomorrow, and with luck, I’ll have the concrete poured by the end of the week. Wish me luck!