Roughing It

Now that the wall framing was up, it was time to start installing everything that goes inside the framing. That means electrical and plumbing lines, and in my case, data cables and fire sprinkler piping. In this entry, I’ll briefly address the rough electrical, plumbing, and data lines, as I will have a separate entry on the sprinkler system (because it’s unique and cool).

Rough service work begins with locating where you want to put stuff. For plumbing, that’s usually spelled out in the plans, e.g., where you want the sink, shower, and toilet, so that part is pretty easy, and the relevant dimensions of where the plumbing fixtures connect are standardized. However, there are some nuances that must be considered, and since I’m doing an entirely custom installation, I decided to get all of my fixtures up front. That way (a) I could look at the installation instructions and actually do measurements if I needed to, and (b) the fixtures all matched. It cost  quite a bit up front, but at least that expense is taken care of (!). So, I went ahead and marked where I wanted the toilet, sink, and shower drains and water supplies to go. Now, I had to learn plumbing.

Supplies 1

All fixtures and parts for the bathrooms, plus the toilet and sink for the MBR bathroom.

Supplies 2

The rest of the parts for the bathrooms. I also bought all of the tile at once to make sure I had it from the same run. Lots of stuff to warehouse!

As a chemical engineer and as an engineer on a nuclear sub, I figured I could deal with the technical aspects of a residential plumbing job. I had to review the relevant codes to make sure I was in compliance, but then I figured, how hard can this be? I was about to find out….

I decided to start with the toilet drain because it was the largest pipe and I found out I would have to be doing some tricky routing through the joists, which I had previously tripled to shore up the master bedroom floor structure. These extra thick joists turned out be be troublesome because the pipe had to be angled to get the slope correct and the hole saw that I was using was only slightly larger than the OD of the pipe. I eventually hammered it in but getting that last joint together was a bitch! I hope it doesn’t leak.

Toilet Drain

Toilet drain piping. See the tripled joists surrounding the pipe? I had to drill big holes through those and ram the piping in!

The next challenge was putting together the water supply system for the showers. I decided to ramp up the quality of the showers by installing a “smart” shower system that uses an electronic control in the shower to remotely control the mixing valve. I went with copper pipe because that’s what the house had to begin with, and I sure got some good experience in sweating the pipes together (turns out that it’s not that hard). The best advice that I got was to use MAPP gas instead of propane. The higher temperature of the flame makes the solder flow much better. Nevertheless, It’s a complex setup and I ended up gouging one of the press-fit O-rings when I inserted the pipe into the mixing valve, so it caused a bit of a mess when I turned on the water to pressure test.

Shower Mixing Valves Annotated

Diagram of the remote shower mixing valves. These are located in the garage directly below the bathrooms. The hot and cold water supplies connect to the mixing valves and the remote controller sets the temperature and volume through the controller signal lines. The water then goes directly to the shower head(s).

Remote Shower Control

Remote shower controller. This is all electronic and has a memory for 4 different settings (his/hers/morning/after workout/whatever).

 

I also found some cool water supply valves that were recessed into the wall and had a very clean look. They are called “stop pull boxes” and are made by a company called “LSP”. If you’re interested, here is their website: LSP Pull Stop Box

And some pictures:

Recessed Water Supply Valve 1

Recessed water supply valve. The valve is the brass fitting in the middle. If you look closely, you can see the ball valve itself (the silver thing in the middle). This is really slick because it’s behind the drywall and the valve is operated by a pushrod attached to the threaded rod on the left-hand side. Looks very clean after installation which I thought was important for a pedestal sink.

Recessed Water Supply 2

Recessed valve installed. The eustachon will cover the hole OK. The brand is “LSP” and the device is called a “pull stop box”.

Going on to rough in the electrical, the plans are important, but I decided I wanted to do some Human Factor Engineering to get the exact location of the switches and lighting fixtures. I imagined myself doing everyday tasks like going to the bathroom, going to the shower, getting dressed, getting ready for bed, etc., and that helped me locate switches so that (a) they would be easy and intuitive to reach for and (b) I could operate the lights from different locations to minimize going back and forth when I wanted to turn something on or off. I also put in extra wall receptacle boxes, especially near where the bed and home office would be. Receptacle and switch boxes are pretty easy to install, so with that done, I was ready to start running wires.

Rough Electrical Bedroom

Example of the customization that one can do if you’re doing this yourself. I added the data and power boxes for the flat screen TV at the last minute (at no cost to the customer).

Running the wires for the rough electrical is something that’s not typically in the plans, which only show the locations of the receptacles, switches, and fixtures. I guess I could have done a schematic diagram, but I figured I would only be doing this once, and as long as I was disciplined in labeling each wire, I would be OK. To run the wires, I did have to plan out where I would be bringing in power from the electrical panel, and then how that power would be distributed throughout the room. The bedroom has two circuits: one for the sink in the bathroom, which needs to be a dedicated GFCI circuit per code, and one for the receptacles and lights. The “current” electrical codes (pardon the pun) require that receptacles in living spaces (bedrooms, living rooms, dens, dining rooms) be AFCI protected, so I needed to take that into account as well. The dedicated GFCI circuit was pretty easy (one wire from the panel to the receptacle), but the other wiring was more involved. The first thing that I did was to bring in power to a receptacle box, and then distribute power to the other receptacle boxes from there. The lighting circuits then tapped off the receptacle boxes.

One thing to keep in mind is the number of wires you have running in and out of each box, and the number of “devices” (switches, receptacles, both of which are referred to as “yolks” in the trade). There is a limit based on the heat load, and there’s a fancy calculation in the NEC, which it turns out, is not trivial. Here is a link to an good explanation. To make things a little easier, I just always get the biggest box possible for the number of devices I want (switches/receptacles) and have not run into any problems.

Electrical Switches and Receptacles

Good example of tailoring the electrical controls beyond the minimum. I can control both lights outside the garage (front and side) and the garage work lights from this location. The front garage door light can also be controlled from the master bedroom and the front door because it is a security and safety feature. I’ve also installed smart switches, where necessary, to allow control automatically under given conditions (e.g., coming home at night, opening the garage door, fire alarm or smoke detector goes off to illuminate egress routes). The receptacles with built-in USB chargers are a must, pretty much in every room.

Routing the wire takes a little planning. The main idea is to drill as few holes as possible, which typically results in running the wires in the ceiling. The other “trick” is to unroll the wire so that it’s flat. If you just pull the wire from the roll, then it will come out twisted and be difficult to staple neatly to the framing. Unrolling it before you pull the wire takes some effort: you have to pick up this heavy roll and heave it ’round several times. But it pays off with a neat and professional installation.

After the wiring was installed, I needed to energize some circuits so we could continue to live normally (if you call living in a house during a remodel “normal” — I guess it’s the “new normal” for us). Despite my supreme confidence in my ability to install some relatively simple electrical work, I flipped on one of the breakers and there was a loud “pop” (“arcing and sparking” in the trade).

Electrical Boo Boo 2

I thought I smelled something funny. Better find out what happened here!

Turns out that I tightened down the cable clamp too tightly and the clamp cut through the insulation and caused a short.

Electrical Boo Boo 1

Forensic analysis showed that I had tightened down the strain relief so much that it cut through the insulation and caused a short. More is not necessarily better!

I felt pretty bad and embarrassed about that, but later, after doing some additional reading in my electrical “how to” books, I found that these sort of things occasionally happen even for the pros. I guess that’s one way to get experience! At any rate, I had to pull the entire cable and replace it because you’re not allowed to splice or patch an electrical cable. All interconnections must be in electrical boxes that have an opening through the drywall to prevent an electrical short from causing a fire behind the drywall.

Lastly is the data cabling. For my project, I’m running a minimum of 2 cat6e ethernet cables and one RG-6 cable per room, but the the master bedroom and home office, I ran quite a few more. I started with standard electrical boxes, but found that low voltage boxes are easier to work with, so from now on, I’m using those. Because these cables are circular in cross section, there’s no need to be too fussy with the unrolling. However, the installation should still be neat. I found some nice cable organizers that allowed me to create nice data cable runs, which was important as the cabling multiplied as I approached the wiring closet.

Data Lines Annotated

Data cables running through the attic. With a minimum of 2 Ethernet and one coax cable per room, that added up pretty quickly. I put a lot of these in the master bedroom because I wanted the cables for a flat screen TV and a home office.

Wiring Closet

Wiring closet replaces the furnace, which was relocated to the attic. All data cabling from the upstairs is run and neatly bundled (on the right). The loose stuff is the cabling from the living room and garage, which needs to be bundled later when I run the rest of the downstairs cabling.

Finally, I had to install draft stops. The inspector pointed this out to me, so that was something I was unaware of, but once I figured it out, it was pretty easy. Basically, wherever you have a penetration through the sole or top plates of your framing, you need to seal the openings. The best way is to use polyurethane foam that comes in a can. You can get a one-use can with an applicator, but I found that hard to control, so I ponied up for a pro applicator, Worked much better, and I figured I’d be using it for other things.

Draft Stop

Draft stop for the data lines coming into the wiring closet. I also had to accommodate the gas line going up to the furnace, which is now in the attic.

So with the rough work done, it was time to put in one of the true infrastructure “upgrades” that I planned for this remodel: a residential fire sprinkler system. Stay tuned…..

 

It’s Electric!

While waiting for some more vacation time to accrue so that I could take a couple of weeks off and do the master bedroom buildout, I had a few weeks with nothing planned in particular. So last week, I decided to get some of my electrical work in. I’ve been researching this for some time and came to the conclusion that I would get the new service entrance panel and breaker panel all mounted and connected, and then I could call the city inspector. After passing that inspection, I could then contact the electric company (SDG&E) at my convenience and have the upgraded services connected at a time convenient for me. So I figured I could at least get the panel installation done.

The first thing was to order all of the parts. I had figured out most of this during the design phase of the remodel, so all I had to do was to re-familiarize myself with the work I already had completed, and then go back into the manufacturer’s catalog (I chose Eaton), get the part numbers, and then type them into the Home Depot website and put them on order for home delivery (that was free). 3 days and $1,000.00 later, I had all of my panels and breakers at the ready.

The next step was to open up the panels to see exactly how they were laid out so I could figure out what would go where, what knockouts I would use, what types of conduit and fittings I would need and what kind of wiring to get. I didn’t need a lot of wire because the panels are back-to-back, but it needed to be pretty hefty wire because it carries all of the house loads. One thing I had to figure out was how to lay out the grounding bus and neutral bus. If this means nothing to you, then you can (a) read my previous blog entry on grounding, (b) go to this website (http://www.wireyourownhouse.com) which does a pretty good job of explaining the terminology, or (c) skip ahead and forget the technical stuff. Since I like the technical stuff and it’s my blog, then I’m going to tell you all about it.

My brand-new meter panel. This is just like Christmas!

My brand-new meter panel. This is just like Christmas!

In most panels, the service (main) breaker and all of the feeder breakers are in the same enclosure. This arrangement allows you to install grounds and neutrals on the same bus. However, once you have a panel which is fed from another breaker (called a sub-panel), you now have to electrically separate the ground from the neutral. The reason for this is because if you have a unbalanced load running, such as a single 120v appliance, then there will be current running on the neutral, and if that neutral is grounded, it will be running through the grounding wire as well, which can be dangerous. It also can screw up the operation of your Ground Fault Circuit Interruption (GFCI) and Arc Fault Interruption (AFCI) breakers.

So, the way I have my panel wired up, with the main service breaker as part of the meter panel, I have to wire the panel with all of the circuit breakers as a sub-panel. Yes, it’s a little more complicated, but I wanted to be able to COMPLETELY de-energize the circuit breaker panel so I could work on it safely. All in one panels are NOT de-energized because you still have live voltage at the cables coming in from the meter into the top of your mains.

No big deal. All of these panels come with a neutral bus that can be separated by removing a jumper bar, and you can now have a separate neutral and ground bus. BUT, I had one problem. Nowadays almost EVERY breaker is going to have GFCI or AFCI protection. Out of the 21 circuits in my design, only 3 use conventional breakers. The GFCI and AFCI breakers have a “pigtail” which forms part of the sensing circuit and connects to the neutral bus. But I really couldn’t see trying to wire the panel with just one neutral bus without having pigtails on the opposite side making a complete mess and a wiring nightmare. If there is anything that I know about electrical work, it is that neatness counts. Big time. Yeah, you can get it to work if your wiring is a rat’s nest. but it will be difficult to work with later, especially if you have to troubleshoot or add a new circuit.  What I really needed was a neutral bus and grounding bus on each side of the panel so that I could have some flexibility in routing the wires.

Well, it turns out that the panel manufacturers make individual grounding busses that you can screw into holes in the panel that just so happen to match. So, I left the jumper between the existing ground and neutral busses and just didn’t connect them to ground, making them both neutral busses, and then installed two of the add-on grounding busses above and connected it all up with proper grounding wire.

Indoor distribution panel modified for neutral and grounding bars on each side.

Indoor distribution panel modified for neutral and grounding bars on each side.

With that problem solved, it was time to locate the panels and figure out how to attach them to the wall. I also had to make sure that it was vertically located to make it easy to work inside the panels, and met the utility company specifications for the height of the meter. The last part was to figure out how the wires would be routed so I could identify the correct “knockouts” to, well, knock out.

After some preliminary fitting, I temporarily attached the indoor breaker panel between the studs and marked the hole for the wires coming in from the meter. I then removed the panel, drilled the hole with a hole saw, and installed a short piece of threaded pipe, or conduit in electrician’s terms, so that the wires would be protected as they passed through the wall.

Closeup of the through-wall conduit, which is the silver pipe on the lower right. The yellow water seal is visible.

Closeup of the through-wall conduit, which is the silver pipe on the lower right. The yellow water seal is visible.

Turning my attention to the meter panel outside, now could locate it using the conduit coming from the inside as an anchor point. After some trial-and-error and trimming of the conduit coming up from the ground for the main power lines and ground wire, I marked the location of the mounting holes in the back of the panel and drilled holes for the mounting bolts. I chose to use carriage bolts for mounting the panel because (a) they would provide a good anchor to the plywood of the wall and (b) they could protrude enough so that I could get a layer of stucco on the plywood before I mounted the panel. More on that later.

Exterior studs and conduit aligned for the outer meter panel. Yes, the stud on the lower left looks a little out of line, but I needed to "adjust" it to make it fit.

Exterior studs and conduit aligned for the outer meter panel. Yes, the stud on the lower left looks a little out of line, but I needed to “adjust” it to make it fit.

Lastly, I needed to fit everything together to make sure it all worked. So, out with the inside panel (again) to install the bolts for the outside panel, replace the inside panel and fit the conduit into the hole in the wall, fiddle around with the outside meter panel to align it with the main power, ground, and thru-wall conduits, and finally fit the panel onto the mounting bolts. How does it look? Ugh! The damned thing was leaning over! But, never a project without some kind of do-over, and because I do a lot of this do-over stuff, I’m pretty good at it. One hour later, voilá! Nicely done.

Outside meter panel temporarily mounted., Want to make sure everything lines up before putting on the waterproofing building paper and stucco.

Outside meter panel temporarily mounted., Want to make sure everything lines up before putting on the waterproofing building paper and stucco.

Well, maybe that wasn’t the last step. I needed to make sure that the wall behind the outside panel was properly waterproofed, and if I installed it directly to the plywood, that would be impossible. The correct solution is courtesy of my favorite stucco guy, Kirk Giordano (http://www.youtube.com/user/StuccoPlastering). He showed a video of putting up stucco behind a new electrical panel with all of the proper waterproofing. In his instance, the panel was already located, but In my case, I could remove the panel to get better access. The key is to properly waterproof plywood with 2 layers of building paper, making sure that you flash and counter-flash around the conduit through the wall and the mounting bolts. Then, it’s time to do some stucco work! I really didn’t want to do a whole lot of it — just enough to make a nice surface in back of the panel. The professional stucco people that I plan on hiring will feather in around the panel and it will all look nice in the end. My job was just to make sure that I left enough room for them to tie into the paper and the lath when they come in to do the finish work.

The studs and conduit are properly wrapped in masking tape to shield them from the onslaught of stucco mud.

The studs and conduit are properly wrapped in masking tape to shield them from the onslaught of stucco mud.

 

Meter panel mounted in the final position. I tried to make the wall in back waterproof, yet easy for the stucco contractor to come in and finish around the panel.

Meter panel mounted in the final position. I tried to make the wall in back waterproof, yet easy for the stucco contractor to come in and finish around the panel.

Closeup of the sealer locknut. This is a great installation.

Closeup of the sealer locknut. This is a great installation.

 

Now the fun part — wiring! To me, this is a fairly straightforward task that is not particularly physically taxing, and you aren’t under any time pressure, like you are with masonry, and it’s pretty clean work (no mortar, sawdust, paint drips, water, etc.). My primary objective when doing wiring, other than meeting all specifications (e.g., wire sizes, connectors, strain reliefs, grounding) is NEATNESS. Especially in the main electrical panel. Wires should not just cris-cross all over the place, but be neatly run, vertically and horizontally, so it is possible to easily follow where each wire goes. As with all projects, a little forethought can go a long way, and in this instance, I figured out that I needed to route the ground wires first because I had to snake the wire coming in from the meter panel in back of the neutral bus on the breaker panel. I then had to connect just 3 more wires: two hot and one neutral. But these were BIG wires. Well, cables if you want to be more descriptive. For a 200 amp service, 2/0 copper is sufficient. There are some techniques for handling this size of cable, and I learned a lot from the Internet, as well as a great book by Rex Cauldwell called Wiring a House (Taunton Press, 2014). But basically, all you need is a utility knife, a pair of linesman pliers, a hacksaw and a crescent wrench (you use the hole in the handle for bending the cable).

Here are some pictures that show some of the electrical details.

Elements of a meter panel. Cables from the transformer at the street come up through the big conduit on the bottom. The two power lines hook up to the bottom of the meter, and the neutral cable hooks up to the neutral bar. The meter goes into the base on the left hand side, The two cables coming out of the top of the meter base go to the main panel breaker. Cables for power and neutral will come down and feed back into the house through the metal conduit on the right. Everything on the left hand side is the responsibility of the utility. Everything on the right hand side is all mine!

Elements of a meter panel. Cables from the transformer at the street come up through the big conduit on the bottom. The two power lines hook up to the bottom of the meter, and the neutral cable hooks up to the neutral bar. The meter goes into the base on the left hand side, The two cables coming out of the top of the meter base go to the main panel breaker. Cables for power and neutral will come down and feed back into the house through the metal conduit on the right. Everything on the left hand side is the responsibility of the utility. Everything on the right hand side is all mine!

 

Everything all wired up for action! The feeder breakers are installed back-to-back along the center so they make contact with one (for120v) or both (for 240v) of the hot legs. Outgoing wires for the branch circuits are routed in along the "gutters" adjacent to the hot legs. What is it about the trades and their terminology? Male and female fittings, nipples, studs, hot legs? Sheesh!

Everything all wired up for action! The feeder breakers are installed back-to-back along the center so they make contact with one (for120v) or both (for 240v) of the hot legs. Outgoing wires for the branch circuits are routed in along the “gutters” adjacent to the hot legs. What is it about the trades and their terminology? Male and female fittings, nipples, studs, hot legs? Sheesh!

And here is a video of me putting all of this together.

All done. Now it’s time for inspection!